|
|
|
|
University of Wisconsin OR/PICU -
Madison, WI
|
 |
|
Contractor: J.H. Findorff & Son |
|
Fabricator: Merrill Iron & Steel |
Detailing: Merrill Iron & Steel
& Nu-Way Engineering Corp |
| Erection:
J.H. Findorff & Son |
|
|
|
|
 |
 |
|
|
SCOPE |
-
1,000 Tons
Structural Steel
-
64,000 Square
feet of new construction on east side of the
existing UW Madison Health Care Facility.
-
The project is
unique in that it utilizes an interstitial
space above each floor to house medical
equipment.
|
|
|
|
|
|
* Complex Steel
Building Structures
*
Conventional Steel Structures
*
Simple Steel Bridges
*
Sophisticated Paint Endorsement |
 |
|
|
|
|