Waukesha Electric Systems - Waukesha, WI
|
|
MANUFACTURING FACILITY–
WAUKESHA, WISCONSIN |
 |
|
Project consisted of : |
|
Three overhead
crane bays
with 46 Built-Up Crane
Columns 70’ in length |
|
130,000 square
feet of
Structural Steel
Joist & Deck
Joist Girders |
|
800 Ton Project |
|
Industrial
building
3-Plate Girders
430 Ton Structural Steel
370 Ton Built-Up Crane Columns |
|
| Contractor: C.G.
Schmidt |
|
| Fabrication:
Merrill Iron & Steel, Inc. |
|
| Detailing:
Pacific Drafting, Inc. |
|
| Erection:
Area Erectors |
|
 |
|
* Complex Steel
Building Structures
*
Conventional Steel Structures
*
Simple Steel Bridges
*
Sophisticated Paint Endorsement |
 |
|
|
|
|